AI procurement evidence benchmark 2026,for decisions another stakeholder can reproduce.

This is a procurement evidence benchmark, not a vendor ranking. It defines the minimum evidence a buying team should collect before turning a polished demo into an approval decision.

Benchmark version
v1.0 · checked 2026-08-14

Public authority sources are separated from SitePilot editorial model inputs. Rows marked buyer-validation-required are deliberately not treated as verified facts.

The benchmark

Eight controls before approve, hold, or reject.

Use each row as an evidence request. A baseline row names the authority guidance; a buyer-validation-required row tells you what must come from the vendor, contract, pilot, or your own operating data.

governance

Governance and risk ownership

baseline

Who owns the AI risk decision, and how are risks mapped, measured, and managed?

Minimum evidence: Named risk owner, risk register, review cadence, and escalation path tied to the proposed workflow.

security

Security and auditability

baseline

Can the vendor demonstrate identity, access, logging, incident response, and control ownership?

Minimum evidence: Current control documentation, testable access model, audit-log scope, and incident commitments.

regulatory-fit

Regulatory applicability

baseline

Which provider, deployer, use-case, and jurisdiction obligations apply?

Minimum evidence: Documented role and use-case mapping with legal review of applicable obligations.

data-controls

Data use, retention, and deletion

buyer-validation-required

What happens to prompts, outputs, telemetry, and customer data during and after the contract?

Minimum evidence: Contract language, retention settings, training-use position, deletion procedure, and verification evidence.

Sources: procurement.blocker-controls-v1 (editorial rule)
architecture

Architecture and integration fit

buyer-validation-required

Does the proposed system fit the existing data flow, identity model, and operating boundaries?

Minimum evidence: Current-state and target-state diagrams, integration test, dependency inventory, and rollback path.

Sources: procurement.blocker-controls-v1 (editorial rule)
pilot

Pilot acceptance criteria

buyer-validation-required

What observable result earns approval to move from pilot to production?

Minimum evidence: Workflow baseline, acceptance thresholds, evaluation set, human review method, and stop conditions.

Sources: procurement.editorial-weights-v1 (editorial rule)
commercial

Commercial and exit risk

buyer-validation-required

What will the total cost, renewal exposure, liability, and exit path look like at production scale?

Minimum evidence: Dated quote, usage assumptions, renewal terms, liability language, portability plan, and switching estimate.

Sources: procurement.editorial-weights-v1 (editorial rule)
decision-record

Decision record and re-review date

baseline

Can another stakeholder reproduce the recommendation and see when it must be revisited?

Minimum evidence: Versioned scores, source dates, unresolved blockers, recommendation, owner, and next review date.

Sources: procurement.editorial-weights-v1 (editorial rule)
Use this as a baseline, then replace assumptions with evidence.

The benchmark does not certify a vendor, predict ROI, or replace legal, security, or architecture review. Record the source date, owner, unresolved blockers, score version, and next review date in the decision memo before approval.